完善主體資料,免費(fèi)贈送VIP會員!
    * 主體類型
    * 企業(yè)名稱
    * 信用代碼
    * 所在行業(yè)
    * 企業(yè)規(guī)模
    * 所在職位
    * 姓名
    * 所在行業(yè)
    * 學(xué)歷
    * 工作性質(zhì)
    請先選擇行業(yè)
    您還可以選擇以下福利:
    行業(yè)福利,領(lǐng)完即止!

    下載app免費(fèi)領(lǐng)取會員

    NULL

    ad.jpg

    Fuzor教程 | Understanding the Symbols in Construction Excavation

    發(fā)布于:2024-10-06 08:40:01

    BIM中文網(wǎng)

    更多

    Construction excavation involves the process of digging and removing materials from the ground to create a foundation for a building or structure. Throughout this process, various symbols are used to communicate important information and ensure safety on the construction site. Understanding these symbols is crucial for construction workers and engineers to carry out their tasks efficiently and prevent accidents.

    One common symbol used in construction excavation is the "X." This symbol is typically used to indicate the location of existing underground utilities, such as water pipes, gas lines, or electrical cables. It warns workers to exercise caution in these areas to avoid damaging these utilities, which could result in dangerous situations or service interruptions.

    Another important symbol is the square with a diagonal line, which represents an "excavation limit" or "dig limit." This symbol indicates the boundary beyond which excavation is not permitted. It is typically used to protect adjacent structures, underground structures, or utility lines from damage during the excavation process.

    The symbol of a ladder or staircase represents an "access point" or "ramp." This symbol indicates the location of safe entry and exit points for workers to access the excavation site. It is essential to have clear and visible access points to ensure the safety of workers who need to enter or exit the excavated area.

    The circle with a letter "P" inside is a symbol used to mark the location of the "pile." Piles are deep foundations made of concrete, steel, or timber, used to support structures on unstable soil or when the load-bearing capacity of the soil is insufficient. The "P" symbol helps workers identify the specific location of the piles for installation or inspection purposes.

    Additionally, the symbol of a rectangle with an arrow pointing downwards represents a "bench" or "step." This symbol indicates a change in elevation or a terraced excavation. Benching is a method used to prevent excavation walls from collapsing by creating horizontal steps or benches along the sides of the excavation. This symbol alerts workers to be aware of changes in the excavation depth and follow proper safety protocols.

    Understanding these symbols in construction excavation is crucial for ensuring the safety and efficiency of the construction process. By following these symbols and guidelines, workers can minimize the risk of accidents, damage to utilities, and structural failures. Proper communication and knowledge of these symbols are essential for maintaining a safe working environment and completing the excavation process successfully.

    Understanding the Symbols in Construction Excavation - BIM,Revit中文網(wǎng)

    本文版權(quán)歸腿腿教學(xué)網(wǎng)及原創(chuàng)作者所有,未經(jīng)授權(quán),謝絕轉(zhuǎn)載。

    未標(biāo)題-1.jpg

    上一篇:Fuzor教程 | 多層基坑設(shè)計復(fù)雜化

    下一篇:Fuzor教程 | Fuzor基坑挖掘教程

    主站蜘蛛池模板: 亚洲一区欧洲一区| 国产一区三区三区| 国产成人精品一区二区三区无码| 乱色熟女综合一区二区三区| 91精品一区二区综合在线| 区三区激情福利综合中文字幕在线一区亚洲视频1 | 精品一区二区久久久久久久网站| 国产日韩视频一区| 天堂成人一区二区三区| 骚片AV蜜桃精品一区| 国产一区二区内射最近更新| 亚洲国产一区二区三区| 国产伦精品一区二区| 免费萌白酱国产一区二区| 国产成人精品亚洲一区| 国产精品福利一区| 国产裸体舞一区二区三区| 亚洲国产成人一区二区三区| 一区二区三区四区国产| 无码8090精品久久一区| 男人的天堂亚洲一区二区三区| 国产成人AV区一区二区三| 国产av一区二区精品久久凹凸| 国产激情一区二区三区在线观看| 国产成人无码精品一区不卡 | 熟女大屁股白浆一区二区| 国产高清在线精品一区小说| 亚洲av片一区二区三区| 狠狠综合久久AV一区二区三区| 精品一区二区三区AV天堂| 一区二区三区福利| 中文字幕一区日韩在线视频| 国产精品无码一区二区三级| 少妇无码一区二区三区免费| 97人妻无码一区二区精品免费 | 亚洲av日韩综合一区在线观看| 人妻无码第一区二区三区| 男人的天堂av亚洲一区2区| 无码国产精品一区二区高潮| 日韩毛片一区视频免费| 国产福利精品一区二区|